DATE Title Description Where
Fall 2006 electrical New 30 and 50 AMP service to A and B docks A B docks
Spring 2007 Stormwater treatment Installed stormwater treatment basins to treat rain water runoff Mid and far yards
Spring 2007 Seawall restoration Repaired seawall, and piles next to seawalls. Installed new railing Mid and far yards
Spring 2007 Paving paved and striped 67K sq ft of parking area Mid and far yards
Fall 2007 New fuel dispensers Bought new digital fuel dispensers C dock
Spring 2008 New docks Built new dock system including new piping for fuel system, and new water system. C and D docks and connecting docks
Spring 2008 New electrical New electrical including repair of all power pedestals, installation of new 3 phase power and all new electrical lines through docks. Installation of 100 AMP service for large transient boats C and D docks
Fall 2008 Fire Suppression system Installed new galvanized pipes for fire suppression system rack building
Fall 2008 Wash water recycling New state of the art closed loop washwater recycling system Pad
Winter 2009 New Mains All new mains with new electrical and water E, F & G
Summer New Mains All new mains with new electrical and water A & B Docks

 

 

 

 

 

 